Tue Aug 11, 2009 | Post #1 | H S Rathi
Join date: Apr 2008 | Post subject: Sand for foundation work
Ghaggar sand is river sand received from river Ghaggar where as dust is the product received from crusher by crushing stone boulders. The sand required for columns should be coarse sand and silt contents should not exceeds 4 % . You can wash the dust to minimize the silt contents. For more detail about coarse sand/ fine aggregate you can take help from link given below.
Sand for construction
| |
|
Thu Jan 28, 2010 | Post #2 | seetharam reddy
Join date: Jan 2010 | Post subject: Designing a Foundation
very good site, gives basic idea , how to proceed in constructing new house.
thanks
msreddy | |
|
Sat Feb 06, 2010 | Post #3 | venkataratnam
Join date: Feb 2010 | Post subject: Designing a Foundation
in the construction area there was a coconut tree earlier and the same was remoed by cutting upto ground level 3 years back. Now is it necessary to remove by digging same.As the same was dead in the ground. presently It will not give any problem for construction work. | |
|
Fri Jun 18, 2010 | Post #4 | Nandan Kumar
Join date: Jun 2010 | Post subject: Designing a Foundation
I want to construct ground plus three level building in area of about 800 sq ft in faridabad. My Engineer has suggested me 9"x9" column size with 4 no.s of 12mm steel, 8mm ring, 150c/c. Total no. of columns are 12. I just want your views regardign column size. | |
|
Fri Jun 25, 2010 | Post #5 | vijay
Join date: Apr 2010 | Post subject: Designing a Foundation
how can i have foundation which is earthquake proof. | |
|
Tue Jun 29, 2010 | Post #6 | umesh
Join date: Jun 2010 | Post subject: Designing a Foundation
i want to construct a g+3 1000 sft house in guwahati what would be the cost for the ground floor | |
|
Wed Aug 04, 2010 | Post #7 | SHEKHAR
Join date: Aug 2010 | Post subject: Designing a Foundation
Is it possible to get some 3D front elevation for my upcoming G+1 ( MAY BE I SHALL ADD 2nd FLOOR LATER)in DURGAPUR(W.B.),if needed i can provide the copy of the plan. Also, pl. tell is vitrified tiles better than the makrana/dungri marble which is around Rs.60/psq.ft. And how can i do exceptional interiors of my house without spending too much money. Thnx ! | |
|
Mon Aug 09, 2010 | Post #8 | R. Damodhar
Join date: Aug 2010 | Post subject: Designing a Foundation
Can any body tell me how to prepare the estimate/rate analysis for centring (shuttering) work;
can directly mail to me. | |
|
Mon Aug 09, 2010 | Post #9 | vimal
Join date: Nov 2007 | Dear Vijay,
Look at the articles listed on the link given below: | |
|
Thu Sep 23, 2010 | Post #10 | natarajan
Join date: Sep 2010 | Post subject: Designing a Foundation
thanks a very useful site | |
|
Thu Sep 23, 2010 | Post #11 | natarajan
Join date: Sep 2010 | Post subject: Designing a Foundation
can you tell laying antitermite treatment at foundation lelel | |
|
Thu Sep 23, 2010 | Post #12 | natarajan
Join date: Sep 2010 | Post subject: desinging a foundation
can you tell about laying antitermite treatment at foundations | |
|
Sat Oct 09, 2010 | Post #13 | mathi
Join date: May 2010 | Post subject: Designing a Foundation
anyone give some suggestion for footing in soil having very low SBC | |
|
Sat Oct 23, 2010 | Post #14 | saravanan
Join date: May 2010 | Post subject: Designing a Foundation
why red soil to be filled? what is acceptence criteria for red soil. | |
|
Tue Oct 26, 2010 | Post #15 | Manjeet Singh
Join date: Sep 2010 | Post subject: Designing a Foundation
Excilent & very helpfull information, Very soon I am going to start built a house at Noida. I will try to built myself will you help me time to time while construction. | |
|
Thu Nov 11, 2010 | Post #16 | kapil advani
Join date: Nov 2010 | Post subject: Designing a Foundation
we have plot 272 guz 35 fut frunt 70 fut depth we want make plot duplex styal pl. give estimate for complite work we want 4 room kitchan dring room living area
thanks | |
|
Tue Nov 16, 2010 | Post #17 | SUNIL
Join date: May 2010 | Post subject: Designing a Foundation
what is the correct procedure to measure the plinth height(either from ground level or from bottom of ground beam) | |
|
Sat Nov 27, 2010 | Post #18 | Mathew John
Join date: Nov 2010 | Post subject: Designing a Foundation
I want to construct a house on a water logged plot.As per my structural engineer, single bulbe under reamed piles of 8.5m depth x 22 Nos
ie., 400mm dia x13 nos and 500mm dia 9 nos =22 nos. Bulb size is 1000 and 1250 respectevely.How to make an estimate? | |
|
Sat Jan 29, 2011 | Post #19 | aa7s7y
Join date: Jan 2011 | Post subject: Designing a Foundation
max plumbob variation allowed at the time of column wooden shuttring and give me check list for columns, beams and slab | |
|
|
|
Foundation-Construction Questions (39) | |
|
|