Before you start painting work
1. Fix scaffolding properly
Planks, bamboos and ‘Ballies’ don’t
rest on or touch the surface to be painted. Proper stage scaffolding is
erected for painting of ceiling. Double scaffolding is provided for
exposed surface.
2. Fill surface voids, pores and cracks
All masonry or plaster surface voids, pores and cracks, nail holes are filled with filler before starting paint work.
3. Clean painting surface and room
The surface is thoroughly
cleaned off mortar droppings, dust, grease and other foreign matters.
Old work, all loose material and scales are removed by sand papering.
The room is thoroughly clean/broom and the whole building is cleaned at
least one day before painting.
4. Dry up priming coat for 48 hours
The priming coat applied already should be dried out for at least 48 hours before starting painting.
5. Fix electrical, water supply, sanitary pipes and door and window frames
All
electrical fittings, water supply, sanitary pipes and door and window
frames are fixed in required position and if found any short coming, it
should be corrected and repaired before starting painting.
6. Wet the surface with water before applying cement paint
The
surface is wet with water before applying cement paint. The surface of
cement paint is cured (watered) after 24 hours of painting.
7. Employ skilled painter
The painter employed for painting is skilled enough to do the job well.
8. Allow newly plastered surface to mature for six months
Newly
plastered surface should be allowed to mature for a period of at least
six months prior to painting work. If you want to start painting before
six months, a coat of alkali resistant priming paint should be done.
9. Fix ladders properly
Ladders used for painting work are tied
with pieces of clothes on the top end of vertical members to avoid
damage or scratches on painting surface.
While painting the surface/wall
10. Mix adequate distemper for one room
Enough distemper is mixed to finish/paint one room at a time. Color preparation for oil bond distemper is computerized.
11. Do painting in right weather condition
Paint work must not
be done in adverse weather condition like hail storm and dust storm
especially for exposed work. The paint work is not done in cold weather
i.e. room temperature is not below 5 degree Celsius.
12. Stir paint well to maintain uniformity
The paint is stirred
well in its original containers with the help of a solid wooden or iron
stick during application of paint to maintain uniform consistency.
13. Do subsequent coats after 24 hours
Subsequent painting coat should be done at least 24 hours after the first is dried well.
14. Paint edges, corners, all doors and window accessories well
All
edges, corners, top and bottom, bolts, nuts, sides, rebate, cleats,
stops, bidding and sash putty with glass pan are painted well. There is
no damage to furniture and fixtures during paint job. At the time of
spray painting, cover doors, windows, bushes etc.
15. Utilize proper brushes
The brush should be of 15 cm long,
double bristles for wall paint. After each day’s work brushes are washed
in hot water thoroughly with soap solution or with thinner and hung
down to dry. Clean containers in hot water with soap solution also.
16. Wear protective glasses and be safe
While painting over head, wear protective glasses to avoid the fall of paint in your eyes.
17. Avoid alcohol and smoking
The painter should not drink
alcohol during painting work as toxic fumes from paint are dangerous for
his health. While painting, do not smoke to avoid fire near painting
area.
18. keep children away from painting area
Don’t allow children
to enter painting area as some paints contain harmful toxic elements.
They should be not allowed to spoil painting work, if so wash them
thoroughly with soap and water.
19. Park your vehicle away from painting area to protect it from the fumes of paint.
Check after painting is over
20. No brush mark is left on surface
Any brush mark is not left
on the surface after the paint is dry. To avoid splashes of paint on
wall the paint should be done on ceiling prior to walls.
21. Clean paint drops thoroughly
Paint drops on floor, electric fittings, door and window fitting and
glass panes are thoroughly cleaned with good quality paint remover.
After cleaning paint drops there are no scratches on glass panes and
fittings etc.
;