Home -> Forums -> Construction -> Start Construction -> Nead architect and contractor to build house

Nead architect and contractor to build house

Sun Apr 16, 2017Total posts : 1
Ajay Sharma
Ajay Sharma
Join date: May 2015
Topic: Nead architect and contractor to build house

Hi,
I have a plot in size 940(20x47) sq ft around, and now i want to construct my house on the same. i need a construction contractor and architect to finalize house plan.
Kindly revert back on this platform or else contact 9999402335 my mobile no.

Regards
Ajay Sharma
Mon Apr 17, 2017Post  #1
S L Gupta (Civil Engg)
S L Gupta (Civil Engg)

Join date: Mar 2008
Dear Sir,
See the
Everyone wants to build a dream home but no-one wants the hassle that comes in day-to-day construction work. Through rate-contractors promise the relief yet a lot of facts should be carefully analyzed before a contractor is hired.
 
GharExpert.com explored the factors one should consider before choosing a contractor and the other factors that will help the relationship stays smooth.

Before hiring the contractor:

STEP 1: If you want to get the construction work on through-rate-basis done by the contractor who has own labor and materials, the following steps provide necessary support in achieving the best quality in the construction. 
  • Obtain required sanctions of all competent authorities before starting the construction work to avoid any obstacle during construction.
  • Complete all drawings and details before allotting the work otherwise there may be a dispute later on.  Many contractors demand more money later on if every thing is not settled in advance.
  • Check the availability of good water for construction work through water supply or by doing bore well.
  • Make sure that the bore well water is equal to the drinking water standard or get the water tested in the laboratory.
  • Do not use hard or salty water as it is harmful to construction work.
  • Check the availability of electricity connection to look after the construction work properly.
  • Fix the floor level of the building according to the level of adjoining building, flood level, and road level before making the agreement. The floor level should be 2 or 3 feet high from the road level.  In case the height of floor level is not mentioned, the contractor tries to maintain the lower floor level to save the time and material cost and earth-filling hassles.

STEP 2: After completing the preliminary steps for construction work, try to contract a good contractor of the area keeping in mind the following requirements.

Contact at least two or three contractors of the area because contractors working in the same area are very helpful in construction work in many ways as follows.

  • He is easily available.
  • He knows the problems of the area very well.
  • He can easily employ extra labor in emergency because his labor is usually working nearby.
  • He can pay more attention to the work as he remains in the same area for all the time.
  • It is very easy to know about the behavior, the dealing and the progress of the work from the house owner whose construction is currently going on.
  • You can easily evaluate the quality in work or progress in work if the contractor belongs to the same area.
 
Make sure you sign a contract with the contractor:

After you have collected the rates from two or three contractors,  select one of the contractor keeping in mind the cost, time to be taken, quality of work and the skills of the contractor.


1. Try to make the agreement on lump sum basis which can be calculated from the area of drawing and by the rate given by the contractors.
2. Avoid making agreement on square feet basis because it can create dispute at the time of measurement.  The contractor may  later on add RCC shelves, balcony, projection and some hidden items of the drawings or designs in the calculations while these items may not be considered extra items for payment according to you.
3. Be watchful of the bad habits of the contractors as some may use sub standard material, demand for hidden or silent items, install less steel bars in the beams and slabs and also minimizes the thickness and size of beams or slabs.
4. Beware of the contractors who try to be very clever and misguides the house owner to get more money. They think that the house owner does not know the construction work or the quality of the material.
5. Make detailed agreement of each construction work in writing with the help of a technical person or friend. It’s usually seen that the contractor agrees with you on all the points verbally but he backs out of many points or items later on. 

Detailed Contract is always better.

While you are making an agreement with a contractor, some detailed points and specification should be written in the agreement. These points help to finalize the agreement and provide better quality in the work.

1. Fix the payment schedule on the pattern given below
a) 20% on collection of raw materials and tools & plant at site.
b) 30% after laying roof slabs.
c) 10 % after cement plastering.
d) 10 % after laying flooring.
e) 10% after fixing door and window shutters.
f) 10 % after fixing sanitary wares, electric fittings and door fittings etc.
g) Remaining 10% after completion of building including painting, “snocem” fixing grills etc. in all respects.
h) Proper receipt of every payment should be taken; if possible payment should be made through cheque.

2. Quality of the materials must be mentioned in the agreement as follows
a) Bricks: Quality of bricks should be first class. The contractor tries to use second class bricks in foundation and in the internal works by justifying that these bricks hold good bond with cement mortar. But this does not happen in practice, so do not agree with this suggestion.

b) Coarse sand: Coarse sand should be coarser and it should be washed to make it free from silt. The contractor tries to use unwashed and silty sand. If the house owner objects the the contractor may say that he would wash the sand later on but that never happens. If coarse sand with silt is used, it will reduce the strength of the structure by 20% to 30%. In general these points seem minor points but they affect the strenght of the building greatly. 
 
After all your kids and your family would be protected by the strength of this building 

c) Bazri: It should be of hard and tough stone having a blue color and mixture of 20 mm or 10 mm.  Contractor tries to use cheap bazri which is in pink, red or reddish color having “kacha” stone and also he uses 10 mm “bazri” which gives more volume. Do not agree with the suggestion as the strength of the structure will be reduced up to 10% because of the low quality bazri. .

d) Cement: Write in the agreement that cement should be from reputed factory and steel bars should be from TMT. Write the quality of the wood that should be used and the Ply board type that should be water proof and also write the types of other articles.

3. Specifications/size:
The design and drawing should be mentioned in the agreement. Concrete should be mixed into the concrete mixer and it should be vibrated. The ratio of cement concrete should not be less than 1:8:16 in foundation, 1:2:4 in beams and slab, 1:6 in brick work and 1:4 in cement plaster. The foundation beam must be provided at DPC level. Floor level should be 2 to 3 feet high. Rainy water pipes should be fixed in masonry wall. The shuttering of column and beam should be water tight.


4. If designs’ drawing is not available, the foundation of the walls should not be less than 3 feet wide and deep. RCC column should be at 10 feet center to center having at least 6 number 12 mm dia bar with 8 mm dia ring and 6 “ center to center.

5. If designs’ drawing is not available, the downward beam should be laid instead of the upward beam. The M S steel bars should not be less than as follows.
a) 16 MM dia bars 4 Numbers
b) 12 MM dia bars 2 Numbers
c) 8 MM dia bars rings at 6 inches center to center.
d) The size should not be less than 9 inches x 12 Inches.
In RCC slabs the steel bars should be 10 MM dia, 6 inches center to center on both sides. The contractor tries to save M S steel bars by placing the steel bars at more distance than that of the required.  In this case do not agree with him. If less steel is used, it will reduce strength of the structure.

6. The type of floor to be laid, glazed tiles in the toilet or kitchen etc. should be mentioned in the agreement. Finishing of the working slab in the kitchen and number of cabinets to be provided in the kitchen should be mentioned

7. The specifications of door and window shutters, grills and cup board shutters with their fittings should also be mentioned in the agreement. Also mention sanitary ware electric fittings, stair railing, and POP and water supply fittings with water tank at the roof in the agreement.

8. The painting or polishing on wood works, walls, roofs and cup boards etc. should be written in the agreement. External finish with designs in plaster and exterior paint finish should be described.

9. Tile tracing at roof height of parapet and “mumty” etc. should be written in the agreement.

10. Door steps, entrance slope, and plinth protection, rainy water “khurra” should be mentioned.

11. Generally the house owner feels that after making the contract, the contractor will be responsible for all the safety measures and any type of mishap. This thinking is wrong.  If any mishap occurs at the construction site, even due to the mishandling, both the house owner and contractor are responsible for it.

The contractor denies giving payment/help to the laborers asking that he has no money and in some cases the laborers abscond from the working site. The compensation to the loss is usually made by the house owner in many cases.

If an agreement is made with contractor on the basis of the safety of the persons working at site, he can not deny for any loss and will be responsible for any mishap later on.
 
Some important things you should know before starting the construction work with the contractor
1. Employ a responsible person for supervision of the work. Make sure you find and hire this person yourself.
2. Check the quality of material and of the work.
3. Do not use unwashed coarse sand and bazri or bricks of inferior quality which reduce the strength of the structure up to 30%.
4. Do not let the contractor to use sub standard material. If it’s allowed once, the contractor will be habitual to use sub standard material again and again.
5. Do not use salty or muddy water in construction which reduces 10% strength of the structure.
6. Pay attention to cure the construction work to gain strength in it. The contractor usually does not cure it to save labor and money.
7. Prepare the mortar according to the measurement as the labor puts cement on some collected sand which is wrong.
8. Mix cement mortar and cement concrete properly. Cement concrete should be vibrated through vibrator.
9. Treat the back of the wooden doors and window frames with anti-termite chemical. Their joints should be fitted with iron sheets.
10. Fill in the hold fast of the door and window frames with cement concrete properly.
11. Apply the priming coat on the door or window frames before fixing them to avoid decay or rusting.
 
;

 

Start Construction-Construction Questions (39)

1413
views
2
answers

anyone can share details of good architect and reputed contractor in gurgaon fo

Last answer on 10/18/2016 5:40:55 PM. by om shrivastava. Forum started by om shrivastava
0
views
0
answers

Help required for construction of basement+ stilt+ 3 floors on 205 sqyd plot in huda gurgaon sector

Last answer on 3/16/2017 10:24:00 PM. Forum started by Mukesh
1729
views
2
answers

Protect Your Family from Dust

Last answer on 10/29/2014 11:16:30 AM. by T RANJITH KUMAR. Forum started by Husain ansari
5427
views
7
answers

Need an Architect in bangalore

Last answer on 7/3/2020 9:15:14 PM. by S L Gupta (Civil Engg). Forum started by kcp
1991
views
1
answers

Construction Agreement

Last answer on 12/21/2021 12:56:56 AM. by S L Gupta (Civil Engg). Forum started by Abhijit
1846
views
1
answers

Good Morning , i am building a house and my contractor has avoided one pillar an

Last answer on 5/24/2016 3:25:55 PM. by S L Gupta (Civil Engg). Forum started by boban
1995
views
2
answers

contractor

Last answer on 5/6/2013 2:30:57 PM. by dan. Forum started by dan
3629
views
1
answers

interiors

Last answer on 7/2/2020 9:26:05 PM. by S L Gupta (Civil Engg). Forum started by pv rao
1570
views
1
answers

Construction of house in Sushant Lok 2 Gurgaon

Last answer on 10/18/2016 11:58:38 AM. by om shrivastava. Forum started by om shrivastava
3499
views
4
answers

Which one is first - Architect or building plan

Last answer on 1/5/2022 8:16:45 PM. by Gopi Chandra. Forum started by Gopi Chandra
2261
views
2
answers

Specification of Steel

Last answer on 12/29/2010 12:48:24 AM. by dhanaraj. Forum started by MEHBOOB
2472
views
1
answers

One place where i can get Architect, Contractor , Plumber, etc for New Home Construction

Last answer on 10/4/2011 3:02:53 AM. by sunny420. Forum started by sunny420
1840
views
2
answers

selection of architect / contractor

Last answer on 12/20/2012 11:36:32 AM. by S L Gupta (Civil Engg). Forum started by Vishwanath
2283
views
1
answers

finding a good labour contractor for building a house

Last answer on 1/25/2014 1:06:21 PM. by S L Gupta (Civil Engg). Forum started by prasad
1487
views
2
answers

Question about VAT - Composition tax/house built by a contractor

Last answer on 12/4/2014 12:57:25 AM. by JAI PRAKASH. Forum started by tej patil
11251
views
3
answers

what is the contractor per square feet price in jaipur for building residential

Last answer on 10/4/2014 8:57:50 PM. by SANJAY DUSANE. Forum started by ashok
2716
views
2
answers

want house plan for 33 by 45 gaj north facing plot

Last answer on 9/14/2021 11:52:28 AM. by JAI PRAKASH. Forum started by savita
1957
views
1
answers

building-contractors_gurgaon

Last answer on 8/19/2020 9:35:46 AM. by JAI PRAKASH. Forum started by abhay srivastava
2843
views
2
answers

Dear sir, We have constructed recently a single story building, during construct

Last answer on 6/17/2013 5:17:52 PM. by Navneet Jharia. Forum started by g.s.rajan
2472
views
1
answers

water proffing

Last answer on 2/26/2022 4:35:55 AM. by JAI PRAKASH. Forum started by chethan
3297
views
2
answers

House Plan

Last answer on 2/25/2022 8:01:38 AM. by TanyaHerrera. Forum started by Farhan
3312
views
3
answers

SLAB REINFORCEMENT

Last answer on 2/24/2022 10:49:59 AM. by S L Gupta (Civil Engg). Forum started by ANKITA MADA
4445
views
0
answers

Floor plans for Marriage Hall of 1000 Sq yards .

Last answer on 2/24/2022 9:00:40 AM. Forum started by faiz
4003
views
3
answers

Estimate for Construction

Last answer on 2/24/2022 5:59:28 AM. by . Forum started by PRATUL
2236
views
1
answers

south face plot pl advice for vastu tips for constructions

Last answer on 2/22/2022 12:41:15 AM. by S L Gupta (Civil Engg). Forum started by VIKAS
2716
views
1
answers

Construction Area calculation

Last answer on 2/21/2022 9:25:15 PM. by JAI PRAKASH. Forum started by Raghav
4230
views
1
answers

Elevation Tile Replcacement

Last answer on 2/21/2022 11:53:49 AM. by S L Gupta (Civil Engg). Forum started by M Prabhu
5197
views
5
answers

For construction.

Last answer on 2/18/2022 10:23:19 PM. by Brajput123. Forum started by khadar
2389
views
2
answers

TYpes of foundation

Last answer on 2/17/2022 6:54:37 AM. by Michaell. Forum started by paresh
2312
views
4
answers

Completion

Last answer on 2/16/2022 12:54:43 AM. by kentsmith698. Forum started by Unnikrishnan
2013
views
2
answers

Construction of house

Last answer on 2/15/2022 8:37:27 AM. by manda sudhakar. Forum started by Rima
2461
views
1
answers

HOME DESIGNING

Last answer on 2/15/2022 8:20:43 AM. by S L Gupta (Civil Engg). Forum started by DEVENDRA GUPTA
2134
views
4
answers

Filter Sand

Last answer on 2/15/2022 2:23:43 AM. by Santhosh GL. Forum started by Santhosh GL
3208
views
1
answers

steel shuttering cost

Last answer on 2/14/2022 11:38:56 PM. by S L Gupta (Civil Engg). Forum started by paresh
2061
views
1
answers

Kothi double story

Last answer on 2/12/2022 12:22:10 AM. by S L Gupta (Civil Engg). Forum started by Neha
12530
views
1
answers

150 or 1350SQFT home cost estimation

Last answer on 2/11/2022 11:08:15 PM. by S L Gupta (Civil Engg). Forum started by sairahul
2179
views
2
answers

house construction

Last answer on 2/10/2022 4:30:32 AM. by S L Gupta (Civil Engg). Forum started by sandip
2026
views
1
answers

First Floor Construction

Last answer on 2/9/2022 6:48:33 PM. by S L Gupta (Civil Engg). Forum started by ANJALI
2744
views
5
answers

House Map

Last answer on 2/9/2022 3:18:35 AM. by ElizabethBer. Forum started by Deepak Kumar




Articles that might interest you!
Why
Why an Architect should be hired?
We recommend that an architect should be appointed for the construction of any house as the professional help would be..
Top
Top 10 Mistakes to avoid when Hiring a Contractor
When planning to build your dream home it may be difficult to hire a good contractor. A successful house construction ..
Building
Building Architect vs. Structure Engineer
It is very important to know the difference between architect and structure engineer if you are planning to construct ..
Orientation
Orientation of Building
To get maximum ventilation and natural light in your house, make sure the building is properly oriented. Orientation o..
Gharexpert
Gharexpert can save you money during construction
Do you know almost all individual home construction projects in India take more money to complete than what people ori..
Which Are Various Reasons of Cracks in Buildings?
Cracks can happen due to foundation movements and settlements of building, thermal movements, chemical reactions, elas..
Building
Building New Home V/S Buying Builder Flat
Buying a builder’s flat may be costlier for you rather than building a new home. But if you plan to make your own, you..
Environmentally
Environmentally Friendly Houses
An environmentally friendly house is designed and built to be in tune with its occupants, nature, environment and ecos..
Environment
Environment Friendly Houses
An environment friendly house is designed and built to be in tune with its occupants, nature, environment and ecosys
13
13 simple pointers to set you on your way to designing your bathroom!
Designing your own bathroom is definitely exciting, but challenging nonetheless. Options are aplenty and you’re not alwa
What are various types of glasses used in doors?
Types of glasses used in doors-Clear window glass, Plate glass, Prism glass, Quartz glass, Processed glass.......
What are advantages and disadvantages of folding doors?
Advantages of folding doors- Easy to install,washable, durable, superior sound damping. Disadvantages-sensitive to har..
What are various designs available in wooden doors?
Designs available in Wooden doors.....
What is standard size of internal folding doors?
Size, Thickness and Weight of Internal Folding Doors.......
What affects the life of doors? What can we do to increase the life of the Wooden doors?
Tips to increase the life of Wooden doors....
What is the standard size of frame for Plastic/PVC doors?
Plastic Door frame size carrying one or two shutters......
What are various frames recommended for Plastic/PVC doors?
Frames for Plastic Doors..........
Which place is appropriate for sliding door?
Appropriate places for sliding doors-Bathrooms, Backyards, Commercial structures...........
What are various frames recommended for glass doors?
Frames for Glass Doors-Wooden frames, Steel frames, Aluminium frames......
Which place is appropriate for folding doors?
Appropriate places for folding doors-Homes, Offices, Guest rooms, gives attaractive and stylish look........
What are the various accessories recommended for folding doors?
Accessories for folding doors- Door Handles, Door Fasteners,Door Viewers.......
What affects the life of doors? What can we do to increase the life of the Plastic/PVC doors?
Tips to increase the life of Plastic doors....
Copyright 2007- GharExpert.com All rights reserved.  

 
 |  Advertize with us  |  About us  |  Contact us  |  RSS  |  Blog  |  Terms of service  |  Style made simple  |  Decorating slide show  |  Tips  |  Give your feedback  |