Tue Aug 25, 2015 | Post #1 | JAI PRAKASH
Join date: May 2014 | You can use the cross pattern of 12 mm and beams of 16 mm saria. The total saria you need is around 1.5 tonne to 1.6 tonne.
| |
|
Wed Aug 26, 2015 | Post #2 | krishna pratap
Join date: Aug 2015 | Thank You Jai Prakas Sir, Please tel me what is difference between Latak Beam ad Hazmi Beam (Beam under the roof) which one is better . My Contractor said I will give all beam under the roof with same sarya as in Latak beam . Pease suggest .
He suggest sarya size . 12 MM at 7" and 10 MM at 5" distance . and crank sarya 10MM between every 7'' . is this is okey pls suggest.
Thanks Krishna | |
|
Wed Aug 26, 2015 | Post #3 | S L Gupta (Civil Engg)
Join date: Mar 2008 | Dear Krishna partap Latak beam means the beam under roof and hazmi beam means beam in roof. Latak beam have more strength than hasmi beam in slab. Contractor wants to lay hazmi beams because shuttering material and labor is more in latak beam. For slab use 12mm steel bars at 7''c/c or 10 mm at 6''c/c.. | |
|
Wed Aug 26, 2015 | Post #4 | krishna pratap
Join date: Aug 2015 | Dear Gupta Sir, Thanks for your valuable suggestion , Please let me know what is the meaning of Crank lintel , and total sarya required for 36*33 feet covered area.
With Regards Krishna
| |
|
Wed Aug 26, 2015 | Post #5 | JAI PRAKASH
Join date: May 2014 | Your contractor is correct.
| |
|
|