Thu Jul 30, 2009 | Post #1 | Gunjan Utraja
Join date: Dec 2007 | There are 2 approaches you can take. You can either hire a separate architectural or any other consulting firm or you can also take help from some retired persons associated with the construction industry if they are available in your area. Where are you constructing your home?
Thanks
| |
|
Tue Aug 04, 2009 | Post #2 | Veena Gil
Join date: Jul 2009 | Post subject: easy to make others understand
You can tell them exactly how you want the house to look by doing 3D for your house.There will be no further confusion.An image says it all. | |
|
Tue Jul 27, 2010 | Post #3 | sundar.srinivasan
Join date: Jul 2010 | Post subject: Through rate-contractor; guidelines for better r...
Dear sir,
I have hired a meason on labour contract. Could you pl provide me templates for terms and conditions regarding construction.
Regards
sundar | |
|
Fri Sep 17, 2010 | Post #4 | G. RAI
Join date: Sep 2010 | Post subject: Through rate-contractor; guidelines for better r...
i want to make my house of 1500 sq ft in lucknow , but i cant decide, kindly help me to call me
9450776737
G.r | |
|
Fri Sep 17, 2010 | Post #5 | G. RAI
Join date: Sep 2010 | Post subject: Through rate-contractor; guidelines for better r...
Could you pl provide me templates for terms and conditions regarding construction. and how much prise will b for each sq ft with material value Regardssundar???
9450776737
G.r | |
|
Fri Sep 17, 2010 | Post #6 | G. RAI
Join date: Sep 2010 | Post subject: Through rate-contractor; guidelines for better r...
kindly provide me best contractor in low rate.. as soon as possible | |
|
Fri Sep 17, 2010 | Post #7 | Gunjan Utraja
Join date: Dec 2007 | Post subject: Reply
Dear Mr. Rai,
Thank you for contacting GharExpert for Architectural services. For initiating it further, Can you please send me the answers of the following questions:
1) Do you want vastu compliant designs? 2) What is your budget? 3) Which type of elevation do you like? Modern, Ethnic, Contemporary,etc. 4) Where are you located? 5) What is the area of the plot? what is the coverage area? 6) How many floors are you planning to build?
Please send me answers asap so that we can proceed further.
Regards Gunjan | |
|
Tue Sep 21, 2010 | Post #8 | Er B P Shakya
Join date: Sep 2010 | Post subject: Through rate-contractor; guidelines for better r...
Could u plz send me all steps of house construction, step by step from fondation to slab, furniture, electrical, pipe fitting etc. | |
|
Sat Oct 02, 2010 | Post #9 | Sunil
Join date: Oct 2010 | Post subject: Through rate-contractor; guidelines for better r...
I have got RCC structure done on contract rates on a plot of 32.5*55 with UG+2, UG being 32.5*37+stairs. Suggest the reasonable contract rates for plaster work, floor (except tiles) with cement ratio. | |
|
Tue Mar 22, 2011 | Post #10 | Gaurav Sablania
Join date: Mar 2011 | Post subject: Through rate-contractor; guidelines for better r...
Hi I am looking for a Residential building contractor in Dharamsala Himachal Pradesh for construction of 2000 sq ft area | |
|
Tue Aug 14, 2012 | Post #11 | Rehan
Join date: May 2011 | Post subject: Through rate-contractor; guidelines for better r...
i want Vastu Deisgns
My budget for construction is 2.9 Million RS
i like ethnic elevation
i am located in pakistan lahore
Area of the plot is 30*60 FT
Ground covered area is 1320
first floor is 860 Ft | |
|
Sun May 26, 2013 | Post #12 | Jacob
Join date: May 2013 | Post subject: Through rate-contractor; guidelines for better r...
what does the lobor contractor job includes:
Water Sump, water tank, Side Walls, Gate and compound walls, Exterior elevation, interior fittings, windows and doors, paintings(exterior, interior, grill painting, plumbing, electrical works & fittings, wardrobe, kitchen fittings, terrace parapet walls, basement- first and second floor flooring, staircase, roofing, material lifting, Grill, bar bending & steel works, Drainage, centering etc
what is the normal rate of labor contractor in mysore | |
|
Sun Oct 20, 2013 | Post #13 | Navin
Join date: Oct 2013 | Post subject: Through rate-contractor; guidelines for better r...
Sir I want to constuct 2500 sq ft are GR+1 IN LONAVALA.
So please guide me or If you have any genuian contractor please provide me as soon as possible. | |
|
Fri Sep 26, 2014 | Post #14 | RAVI SANYAL
Join date: Sep 2014 | Post subject: Through rate-contractor; guidelines for better r...
Looking For Labour Rate Contract With Out Material
Can We Get Get Some Agreement Format | |
|
Fri May 29, 2015 | Post #15 | sam
Join date: May 2015 | Post subject: Through rate-contractor; guidelines for better r...
WHAT IS THE COST TO CONSTRUCT 300 SQ FT OF 2 ROOMS ( 10X20 N 10X10) OF WHICH BOTH ROOMS HAVE TO MAKE ONLY JOINT AS L SHAPE CONSTRUCTION. REVERSED L SHAPED 2 WALLS ARE ALREADY EXIST IN THE BUILDING. ALSO COST OF 4X4X4 SEPTIC TANK N 2X2X1 CHAMBERS OF NUMBERED 3. IN CHENNAI PL.HELP ME-SAM | |
|
Tue Sep 15, 2015 | Post #16 | dibyendu
Join date: Oct 2014 | Post subject: Through rate-contractor; guidelines for better r...
I want to build a new const. at Burdwan, West Bengal.Can anyone provide/post a model agreement between builder and a labour contractor? This will very helpful to me. | |
|
|