Home -> Forums -> Construction -> Start Construction -> south face plot pl advice for vastu tips for constructions

south face plot pl advice for vastu tips for constructions

Tue May 23, 2017Total posts : 1
VIKAS
VIKAS
Join date: May 2017
Topic: south face plot pl advice for vastu tips for constructions

Dear all i have a plot size 12.40 mtr*25,mtr and it is south face plot pl give your valuable advoice for start their constructions with vastu tips
Wed May 24, 2017Post  #1
S L Gupta (Civil Engg)
S L Gupta (Civil Engg)

Join date: Mar 2008
Dear Sir.
    See
   
Everyone wants to build a dream home but no-one wants the hassle that comes in day-to-day construction work. Through rate-contractors promise the relief yet a lot of facts should be carefully analyzed before a contractor is hired.
 
GharExpert.com explored the factors one should consider before choosing a contractor and the other factors that will help the relationship stays smooth.

Before hiring the contractor:

STEP 1: If you want to get the construction work on through-rate-basis done by the contractor who has own labor and materials, the following steps provide necessary support in achieving the best quality in the construction. 
  • Obtain required sanctions of all competent authorities before starting the construction work to avoid any obstacle during construction.
  • Complete all drawings and details before allotting the work otherwise there may be a dispute later on.  Many contractors demand more money later on if every thing is not settled in advance.
  • Check the availability of good water for construction work through water supply or by doing bore well.
  • Make sure that the bore well water is equal to the drinking water standard or get the water tested in the laboratory.
  • Do not use hard or salty water as it is harmful to construction work.
  • Check the availability of electricity connection to look after the construction work properly.
  • Fix the floor level of the building according to the level of adjoining building, flood level, and road level before making the agreement. The floor level should be 2 or 3 feet high from the road level.  In case the height of floor level is not mentioned, the contractor tries to maintain the lower floor level to save the time and material cost and earth-filling hassles.

STEP 2: After completing the preliminary steps for construction work, try to contract a good contractor of the area keeping in mind the following requirements.

Contact at least two or three contractors of the area because contractors working in the same area are very helpful in construction work in many ways as follows.

  • He is easily available.
  • He knows the problems of the area very well.
  • He can easily employ extra labor in emergency because his labor is usually working nearby.
  • He can pay more attention to the work as he remains in the same area for all the time.
  • It is very easy to know about the behavior, the dealing and the progress of the work from the house owner whose construction is currently going on.
  • You can easily evaluate the quality in work or progress in work if the contractor belongs to the same area.
 
Make sure you sign a contract with the contractor:

After you have collected the rates from two or three contractors,  select one of the contractor keeping in mind the cost, time to be taken, quality of work and the skills of the contractor.


1. Try to make the agreement on lump sum basis which can be calculated from the area of drawing and by the rate given by the contractors.
2. Avoid making agreement on square feet basis because it can create dispute at the time of measurement.  The contractor may  later on add RCC shelves, balcony, projection and some hidden items of the drawings or designs in the calculations while these items may not be considered extra items for payment according to you.
3. Be watchful of the bad habits of the contractors as some may use sub standard material, demand for hidden or silent items, install less steel bars in the beams and slabs and also minimizes the thickness and size of beams or slabs.
4. Beware of the contractors who try to be very clever and misguides the house owner to get more money. They think that the house owner does not know the construction work or the quality of the material.
5. Make detailed agreement of each construction work in writing with the help of a technical person or friend. It’s usually seen that the contractor agrees with you on all the points verbally but he backs out of many points or items later on. 

Detailed Contract is always better.

While you are making an agreement with a contractor, some detailed points and specification should be written in the agreement. These points help to finalize the agreement and provide better quality in the work.

1. Fix the payment schedule on the pattern given below
a) 20% on collection of raw materials and tools & plant at site.
b) 30% after laying roof slabs.
c) 10 % after cement plastering.
d) 10 % after laying flooring.
e) 10% after fixing door and window shutters.
f) 10 % after fixing sanitary wares, electric fittings and door fittings etc.
g) Remaining 10% after completion of building including painting, “snocem” fixing grills etc. in all respects.
h) Proper receipt of every payment should be taken; if possible payment should be made through cheque.

2. Quality of the materials must be mentioned in the agreement as follows
a) Bricks: Quality of bricks should be first class. The contractor tries to use second class bricks in foundation and in the internal works by justifying that these bricks hold good bond with cement mortar. But this does not happen in practice, so do not agree with this suggestion.

b) Coarse sand: Coarse sand should be coarser and it should be washed to make it free from silt. The contractor tries to use unwashed and silty sand. If the house owner objects the the contractor may say that he would wash the sand later on but that never happens. If coarse sand with silt is used, it will reduce the strength of the structure by 20% to 30%. In general these points seem minor points but they affect the strenght of the building greatly. 
 
After all your kids and your family would be protected by the strength of this building 

c) Bazri: It should be of hard and tough stone having a blue color and mixture of 20 mm or 10 mm.  Contractor tries to use cheap bazri which is in pink, red or reddish color having “kacha” stone and also he uses 10 mm “bazri” which gives more volume. Do not agree with the suggestion as the strength of the structure will be reduced up to 10% because of the low quality bazri. .

d) Cement: Write in the agreement that cement should be from reputed factory and steel bars should be from TMT. Write the quality of the wood that should be used and the Ply board type that should be water proof and also write the types of other articles.

3. Specifications/size:
The design and drawing should be mentioned in the agreement. Concrete should be mixed into the concrete mixer and it should be vibrated. The ratio of cement concrete should not be less than 1:8:16 in foundation, 1:2:4 in beams and slab, 1:6 in brick work and 1:4 in cement plaster. The foundation beam must be provided at DPC level. Floor level should be 2 to 3 feet high. Rainy water pipes should be fixed in masonry wall. The shuttering of column and beam should be water tight.


4. If designs’ drawing is not available, the foundation of the walls should not be less than 3 feet wide and deep. RCC column should be at 10 feet center to center having at least 6 number 12 mm dia bar with 8 mm dia ring and 6 “ center to center.

5. If designs’ drawing is not available, the downward beam should be laid instead of the upward beam. The M S steel bars should not be less than as follows.
a) 16 MM dia bars 4 Numbers
b) 12 MM dia bars 2 Numbers
c) 8 MM dia bars rings at 6 inches center to center.
d) The size should not be less than 9 inches x 12 Inches.
In RCC slabs the steel bars should be 10 MM dia, 6 inches center to center on both sides. The contractor tries to save M S steel bars by placing the steel bars at more distance than that of the required.  In this case do not agree with him. If less steel is used, it will reduce strength of the structure.

6. The type of floor to be laid, glazed tiles in the toilet or kitchen etc. should be mentioned in the agreement. Finishing of the working slab in the kitchen and number of cabinets to be provided in the kitchen should be mentioned

7. The specifications of door and window shutters, grills and cup board shutters with their fittings should also be mentioned in the agreement. Also mention sanitary ware electric fittings, stair railing, and POP and water supply fittings with water tank at the roof in the agreement.

8. The painting or polishing on wood works, walls, roofs and cup boards etc. should be written in the agreement. External finish with designs in plaster and exterior paint finish should be described.

9. Tile tracing at roof height of parapet and “mumty” etc. should be written in the agreement.

10. Door steps, entrance slope, and plinth protection, rainy water “khurra” should be mentioned.

11. Generally the house owner feels that after making the contract, the contractor will be responsible for all the safety measures and any type of mishap. This thinking is wrong.  If any mishap occurs at the construction site, even due to the mishandling, both the house owner and contractor are responsible for it.

The contractor denies giving payment/help to the laborers asking that he has no money and in some cases the laborers abscond from the working site. The compensation to the loss is usually made by the house owner in many cases.

If an agreement is made with contractor on the basis of the safety of the persons working at site, he can not deny for any loss and will be responsible for any mishap later on.
 
Some important things you should know before starting the construction work with the contractor
1. Employ a responsible person for supervision of the work. Make sure you find and hire this person yourself.
2. Check the quality of material and of the work.
3. Do not use unwashed coarse sand and bazri or bricks of inferior quality which reduce the strength of the structure up to 30%.
4. Do not let the contractor to use sub standard material. If it’s allowed once, the contractor will be habitual to use sub standard material again and again.
5. Do not use salty or muddy water in construction which reduces 10% strength of the structure.
6. Pay attention to cure the construction work to gain strength in it. The contractor usually does not cure it to save labor and money.
7. Prepare the mortar according to the measurement as the labor puts cement on some collected sand which is wrong.
8. Mix cement mortar and cement concrete properly. Cement concrete should be vibrated through vibrator.
9. Treat the back of the wooden doors and window frames with anti-termite chemical. Their joints should be fitted with iron sheets.
10. Fill in the hold fast of the door and window frames with cement concrete properly.
11. Apply the priming coat on the door or window frames before fixing them to avoid decay or rusting.
 
;

 

Start Construction-Construction Questions (38)

2529
views
2
answers

Kindly tell vastu tips for west facing plot for construction of dental clinic

Last answer on 10/1/2021 5:05:33 AM. by JesseMWoodley. Forum started by Adarsh
2969
views
5
answers

Plot location

Last answer on 9/2/2019 1:35:07 AM. by s.m.sudhan. Forum started by s.m.sudhan
29022
views
1
answers

2BHK PLAN FOR SOUTH FACING PLOT AS PER VASTU PLOT SIZE 28*60

Last answer on 8/4/2014 11:53:30 AM. by seema tyagi. Forum started by neelakandan
4242
views
2
answers

My plot is south west facing,size 15*60 , how to construct according vastu

Last answer on 1/29/2022 11:00:22 AM. by Saurav anand. Forum started by Manoj
2440
views
2
answers

South face plot for vastu

Last answer on 4/5/2018 12:52:30 AM. by S L Gupta (Civil Engg). Forum started by Yogesh singh
1386
views
1
answers

Sir, mmy plot size 31'*32.6' facing .south.pls.suggest vastu degine naksha.

Last answer on 6/30/2018 1:43:16 AM. by S L Gupta (Civil Engg). Forum started by Laxmikant Khandelwal
13483
views
1
answers

25 x 35 plot size south side facing h as per vastu best plan KY hoga

Last answer on 7/3/2020 11:13:29 PM. by S L Gupta (Civil Engg). Forum started by Vijay
2035
views
1
answers

vastu tip for west fecing plot

Last answer on 1/22/2022 11:26:02 AM. by S L Gupta (Civil Engg). Forum started by priyanka sinha
5922
views
4
answers

Hi, I need plan for 30*40 feet east facing house door in south facing plot with

Last answer on 11/14/2016 11:10:29 AM. by Ashok. Forum started by gmaghesh
4492
views
4
answers

vastu

Last answer on 2/23/2022 10:59:42 AM. by Nitien Parmar. Forum started by suryarao p
7417
views
2
answers

30'by60' (north west facing 30') plot home plan according to vastu for 3 bedroom

Last answer on 12/9/2013 11:00:14 AM. by S L Gupta (Civil Engg). Forum started by B.N.Agariya
2124
views
2
answers

i want to buy a plot south face of 23 feet by 50feet, pl suggest one house plan

Last answer on 7/3/2015 3:33:15 AM. by JAI PRAKASH. Forum started by seshagiri
1630
views
1
answers

Respected sir, Please upload 29×66 south facing plot ground floor d

Last answer on 2/12/2022 12:31:01 AM. by S L Gupta (Civil Engg). Forum started by Vikram parihar
3834
views
2
answers

can anyone suggest floor plan for duplex construction in east facing plot it sho

Last answer on 6/5/2014 2:00:54 PM. by seema tyagi. Forum started by ashok
3817
views
1
answers

i intend to construct a home with plinth area of1240 sq ft in a 2244 sq ft plot

Last answer on 5/5/2014 12:57:31 PM. by seema tyagi. Forum started by lb sharma
3127
views
1
answers

we need house plan for 1340 sqt which is south facing plot and we need with east

Last answer on 5/6/2014 3:12:22 PM. by seema tyagi. Forum started by ranjana
12555
views
1
answers

plan for 30*40 feet east facing house in south facing plot. plz send the plan fo

Last answer on 11/14/2016 11:10:55 AM. by Amit Hasija. Forum started by chakravrthi
6873
views
1
answers

42-50 west south corner plot please give me vastu house plan 1500 to 1600 sft co

Last answer on 7/3/2020 11:38:42 PM. by seema tyagi. Forum started by muralipuram
2382
views
1
answers

pl send me40feetlenth 30feet berth plot, 850feet(or)900feet 2bhk north(or)east f

Last answer on 8/24/2021 3:22:22 AM. by S L Gupta (Civil Engg). Forum started by nagarajan.n
2443
views
1
answers

water proffing

Last answer on 2/26/2022 4:35:55 AM. by JAI PRAKASH. Forum started by chethan
3265
views
2
answers

House Plan

Last answer on 2/25/2022 8:01:38 AM. by TanyaHerrera. Forum started by Farhan
3278
views
3
answers

SLAB REINFORCEMENT

Last answer on 2/24/2022 10:49:59 AM. by S L Gupta (Civil Engg). Forum started by ANKITA MADA
4424
views
0
answers

Floor plans for Marriage Hall of 1000 Sq yards .

Last answer on 2/24/2022 9:00:40 AM. Forum started by faiz
3970
views
3
answers

Estimate for Construction

Last answer on 2/24/2022 5:59:28 AM. by . Forum started by PRATUL
2695
views
1
answers

Construction Area calculation

Last answer on 2/21/2022 9:25:15 PM. by JAI PRAKASH. Forum started by Raghav
4206
views
1
answers

Elevation Tile Replcacement

Last answer on 2/21/2022 11:53:49 AM. by S L Gupta (Civil Engg). Forum started by M Prabhu
5160
views
5
answers

For construction.

Last answer on 2/18/2022 10:23:19 PM. by Brajput123. Forum started by khadar
2370
views
2
answers

TYpes of foundation

Last answer on 2/17/2022 6:54:37 AM. by Michaell. Forum started by paresh
2289
views
4
answers

Completion

Last answer on 2/16/2022 12:54:43 AM. by kentsmith698. Forum started by Unnikrishnan
1991
views
2
answers

Construction of house

Last answer on 2/15/2022 8:37:27 AM. by manda sudhakar. Forum started by Rima
2441
views
1
answers

HOME DESIGNING

Last answer on 2/15/2022 8:20:43 AM. by S L Gupta (Civil Engg). Forum started by DEVENDRA GUPTA
2111
views
4
answers

Filter Sand

Last answer on 2/15/2022 2:23:43 AM. by Santhosh GL. Forum started by Santhosh GL
3190
views
1
answers

steel shuttering cost

Last answer on 2/14/2022 11:38:56 PM. by S L Gupta (Civil Engg). Forum started by paresh
2041
views
1
answers

Kothi double story

Last answer on 2/12/2022 12:22:10 AM. by S L Gupta (Civil Engg). Forum started by Neha
12508
views
1
answers

150 or 1350SQFT home cost estimation

Last answer on 2/11/2022 11:08:15 PM. by S L Gupta (Civil Engg). Forum started by sairahul
2157
views
2
answers

house construction

Last answer on 2/10/2022 4:30:32 AM. by S L Gupta (Civil Engg). Forum started by sandip
2005
views
1
answers

First Floor Construction

Last answer on 2/9/2022 6:48:33 PM. by S L Gupta (Civil Engg). Forum started by ANJALI
2721
views
5
answers

House Map

Last answer on 2/9/2022 3:18:35 AM. by ElizabethBer. Forum started by Deepak Kumar




Articles that might interest you!
EAST
EAST FACING PLOT
A north-east facing plot is best for all type of constructions, whether a house or a business establishment. However, ..
Shape
Shape of the PLOT
The shape of a plot really affects the prosperity it would be generating. So before choosing your plot check out the ..
Vaastu
Vaastu for Plot
Building a dream home needs vigilant considerations and apart from the good architectural design and construction tech..
Vastu
Vastu for Construction of House
If you have bought a land/plot which is not as per vastu, you can amend it by making proper construction and using pro..
vaastu
vaastu or superstition
A beautiful home all of a sudden becomes unsuitable to live - in because principles of vaastu are not applied to its c..
Stair construction-Things to remember
Stair construction needs major consideration while you are either building a new home or just doing any renovation. Th..
Vastu
Vastu for Kitchen
Vastu governs the kitchen prominently. East quadrant is an excellent location for kitchen as this area brings prosperity
Vaastu Shastra-Meaning and Relevance in the real estate market
Vastu is a Sanskrit word which means Vaas: Live Tu: you, a place where you live or dwell. Shastra means a text which c..
Children
Children Room Vastu Tips
Keeping everything in positive direction in children’s room results in creative thinking and good health because this ..
Vastu
Vastu Shastra for Staircase
Stairs have a great impact, confirms Vastu. Wrongly placed stairs can cause adverse effects on health and wealth. Stai..
What are various types of glasses used in doors?
Types of glasses used in doors-Clear window glass, Plate glass, Prism glass, Quartz glass, Processed glass.......
What are advantages and disadvantages of folding doors?
Advantages of folding doors- Easy to install,washable, durable, superior sound damping. Disadvantages-sensitive to har..
What are various designs available in wooden doors?
Designs available in Wooden doors.....
What is standard size of internal folding doors?
Size, Thickness and Weight of Internal Folding Doors.......
What affects the life of doors? What can we do to increase the life of the Wooden doors?
Tips to increase the life of Wooden doors....
What is the standard size of frame for Plastic/PVC doors?
Plastic Door frame size carrying one or two shutters......
What are various frames recommended for Plastic/PVC doors?
Frames for Plastic Doors..........
Which place is appropriate for sliding door?
Appropriate places for sliding doors-Bathrooms, Backyards, Commercial structures...........
What are various frames recommended for glass doors?
Frames for Glass Doors-Wooden frames, Steel frames, Aluminium frames......
Which place is appropriate for folding doors?
Appropriate places for folding doors-Homes, Offices, Guest rooms, gives attaractive and stylish look........
What are the various accessories recommended for folding doors?
Accessories for folding doors- Door Handles, Door Fasteners,Door Viewers.......
What affects the life of doors? What can we do to increase the life of the Plastic/PVC doors?
Tips to increase the life of Plastic doors....
Copyright 2007- GharExpert.com All rights reserved.  

 
 |  Advertize with us  |  About us  |  Contact us  |  RSS  |  Blog  |  Terms of service  |  Style made simple  |  Decorating slide show  |  Tips  |  Give your feedback  |