yogiagarwal
Profile
More Options
 yogiagarwal's Network (0)
 yogiagarwal's Groups (0)
 yogiagarwal's Collection
No pictures...!See All
No articles...!See All
No Tip(s)...!
No style made simple...!
No picture story(s)...!
No Plan(s)...!
 yogiagarwal's Articles (0)

 
  yogiagarwalUpdated on 2/19/2009  
Current profession: Gender: 
  Send an email to yogiagarwal 
*Your Message
 
  Pictures uploaded by yogiagarwal 

Forums contributed by yogiagarwal

3139
views
2
answers

terrace gardens

The following steps should be taken to eliminate dampness under ceiling and adjacent walls. Clean top surface of the slab by rubbing with wire brush and gunny bags and wash it with water.Construct cement concrete gola in the junction of slab and wall by dismantling old material or plaster on walls and slab.Paint top surface of slab, cement concrete gola and cement plaster on walls up to 1.5 feet h.
2905
views
1
answers

Sand in Water

It seems that bore well is not fully developed at the time of fixing water pump. Also the gravels are not filled around casing pipes as additional precaution so that mud and sand do not enter the perforated pipes with water when the pump is operated. Now, to develop bore well operate pump continuously at least for 10 to 12 hours with small intervals. After the develop.
 yogiagarwal's Videos (0) 
No video(s) found..!
 
 Fresh at yogiagarwal's profileSee All    
  22 November, 2024
No content(s) available..!

 yogiagarwal's ProjectsSee All
 Contact Information
Address: 
City: 
Zip: 
Country: 
Website: 
 Education and Work Experience See All
 Education Info
No education(s) found..!
 Experience Info
 No experience(s) found..!
Copyright 2007- GharExpert.com All rights reserved.  

 
 |  Advertize with us  |  About us  |  Contact us  |  RSS  |  Blog  |  Terms of service  |  Style made simple  |  Decorating slide show  |  Tips  |  Give your feedback  |