Question details
 
Need detailed estimate
Hi,

I have aplot of 32 sq. meters in Rohini, New Delhi. I want to construct home at ground, first and second floor. For this I need a detailed estimate for the house. Attached here is drawing of ground and first floor, and second floor will be same as first.

Let me know if you have any question?

Sunil

( Attachment: Ground1.jpg for Ground Floor and first1.jpg for First and Second Floor)

Price : Rs.2,000
Paid : Rs.2,000
Balance : Rs.0
Question category : Start Construction
On : 06/24/2008
Views : 5166
Status : Answered
Files attached : ground1.jpg   on :Tue Jun 24, 2008 1:35 PM
                         first1.jpg   on :Tue Jun 24, 2008 1:35 PM
Expert(s) chosen:  S L Gupta
   
 
Status history
Answered by S L Gupta on Wed Jul 02, 2008 4:07 PM
 

Mr. Sunil,

As desired by your good self the detail cost estimate for construction of your house as per drawing supplied by you from 1st story to 3rd story with mumty at 4th story for Rs. 7,479,52 is hereby sent to you. The stage wise details of materials required for the construction work is also attached. This will help you to budget properly and you can arrange construction material accordingly. Please let me know if you have any question?

DETAIL ESTIMATES FOR CONSTRUCTION OF A HOUSE OF SHRI SUNIL VANUGOPAL ,ROHINI AT DELHI AS PER DRAWING SUPPLIED

DETAIL ESTIMATES FOR CONSTRUCTION OF A HOUSE OF SHRI SUNIL VANUGOPAL ,ROHINI AT DELHI AS PER DRAWING SUPPLIED

Sr.No

Quantity

Description of item

Rate

Unit

Amount

1

25.999

Earth work in excavation in foundation and plinth including refilling around the masonry complete

55

CUM

1,430

2

16

Earth work in filling under floors including carriage from 10 km including watering ramming complete

100

CUM

1,600

3

8.66

Cement concrete 1:8 :16 in foundation and plinth with brick ballast 40 mm gauze

1450

CUM

12,557

4

10.81

First class brick work in cement mortar 1:6 in foundation and plinth complete

1810

CUM

19,566

5

5.69

40 mm Thick horizontal damp proof course with cement concrete1:2:4 and two coat of hot bitumen complete

170

SQM

967

6

 

First class brick work in cement mortar 1:4 in super structure

 

 

0

a

12.62

First story

1890

CUM

18,804

b

13.67

Second story

1950

CUM

26,657

c)

13.67

Third story

2020

CUM

27,613

d

7.05

4 th sstoory

2100

CUM

14,805

7

 

11.43 cm thick brick wall in cement mortar 1:4 in super structure

 

 

0

a

24.93

First story

250

SQM

6,233

b

16.1

Second story

260

SQM

4,186

c)

16.1

Third story

270

SQM

4,347

8

 

RCC 1:1.5:3 in lintels , beams , columns including centering and shuttering but excluding steel reinforcement complete in position

 

 

0

a

1.6

First story

5100

CUM

8,160

b

1.62

Second story

5150

CUM

8,343

c)

1.62

Third story

5200

CUM

8,424

9

 

RCC 1:1.5:3 in slabs   including centering and shuttering but excluding steel reinforcement complete in position

 

 

0

a

3.21

First story

5050

CUM

16,211

b

3.21

Second story

5100

CUM

16,371

c)

3.21

Third story

5200

CUM

16,692

d

0.45

4th story

5250

CUM

2,363

10

6

AC band 100 mm diameter

50

each

300

11

 

Supply of AC PIPES in cluding fixing in floors and walls complete

 

 

0

a

26

100 mm Diameter

120

Meter

3,120

b

15

75 mm diameter

100

Meter

1,500

c)

10

150 mm diameter

200

Meter

2,000

12

22.12

Tile terracing with bricks tiles 9 " X4.5" X1.5 " on mud mortar laid on earth filling 3 inch thick on bitumen painted RCC surface complete

234

sqm

5,176

13

 

12 mm Thick cement plaster 1:4 under ceiling /roof

 

 

0

a

28.42

First story

65

sqm

1,847

b

28.42

Second story

66

sqm

1,876

c)

28.42

Third story

67

sqm

1,904

d

4.05

4th story

68

sqm

275

14

 

15 mm thick cement plaster 1:4 on brick walls complete

 

 

0

a

159.32

First story

67

sqm

10,674

b

151.7

Second story

68

sqm

10,316

c)

151.7

Third story

69

sqm

10,467

d

63.58

4th story

70

sqm

4,451

15

25.75

Base course of floors consisting of 100 mm thick cement concrete 1:8:16 with brick ballast 40 mm gauze

180

sqm

4,635

16

 

Secreed  50 mm thick with cement concrete 1:8:16 on slab.

 

 

0

a

18

Second story

90

Sqm

1,620

b

18

Third story

91

Sqm

1,638

17

91.77

White Marble Stone Flooring laid with 20 mm thick cement mortar 1:3 including filling the joints with white cement and rubbed and poliished complete

1100

Sqm

100,947

18

50.52

Glaze tiles /ceramic tiles fixed on walls with 12 mm thick cement mortar 1:3 including filling the joints with white cement mixed with pigment according to the required colour and size complete

520

sqm

26,270

19

0.72

Grenite marble stone slab laid with 20 mm thick cement mortar 1:3 including filling the joints with white cement rubbed and polished com -lete

1500

sqm

1,080

20

1.17

Hardwood  frames for doors and windows completely including fixing with iron holdfast and cement concrete 1:2:4 complete

32500

cum

38,025

21

20

Hard wood door shutter with teak phase ply on both side fixed in position

1300

sqm

26,000

22

13.07

Hard wood windows shutters with glass panels fixed in position

1080

sqm

14,116

23

23.27

Hard wood door and windows wiregauze shutters fixed in position

1000

sqm

23,270

24

43.209

20 mm thick ply board fixed in position for cup boards complete

520

sqm

22,469

25

13.2

Fixing sunmika on cup board shutters including necessary nails etc.

300

sqm

3,960

26

14.89

Mild steel tor /ribbed bars for RCC including bending binding and placing

5100

qtl.

75,939

27

4.708

Mild steel grills ,railing completely fixed  in position

5100

qtl.

24,011

28

 

Door and windows fittings completely fixed with screws etc.

 

 

0

a

6

Mortice locks & latches

350

each

2,100

b

38

Handles 6 inches

10

each

380

c)

25

Tower bolt 10 inches

15

each

375

d

25

Tower bolt 6 inches

12

each

300

e

13

Sliding bolt

40

each

520

f

56

Handle 4 inches

8

each

448

g

112

Tower bolt 4 inches

8

each

896

h

19

Door stoper

10

each

190

i

6

Helical door spring

250

each

1,500

j

30

Cupboard handle

10

each

300

k

30

Megnet for cupboard

8

each

240

l

9

Cupboard locks

50

each

450

29

 

Water supply and sanitary items

 

 

0

a

1

Sink

500

each

500

b

3

Wash basin

500

each

1,500

c)

3

Shower

100

each

300

d

3

Consealed

100

each

300

e

18

Bibcock long bodoy

150

each

2,700

f

3

Bibcock short body

100

each

300

g

1

Water closet Indian

500

each

500

h

2

Water closet English

800

each

1,600

i

2

Waste pipe

20

each

40

j

2

Jet

50

each

100

k

2

Paper holder

100

each

200

L

50

G I Pipe with accessaries

80

Meter

4,000

m

3

Sstop cock

200

each

600

N

2

Water tank 500 liter

1500

each

3,000

30

141.01

Painting two coat including priming coat on wood work complete

35

sqm

4,935

31

615.62

Painting two coat inluding priming coat on walls

30

sqm

18,469

32

Job

Electrical fittings including laying pipes ,fan hooks ,ceiling rose ,boxes seats ,switches and other accessaries

 

Total

679,957

 

 

 

10%

 

67,995

 

 

 

 

G.Total

747,952


DETAILS OF VARIOUS MATERIALS
UP TO PLINTH LEVEL/ DPC
Cement = 23 Bags
Fine sand  = 200. CFT
Coarse Sand = 150 CFT
Brick ballast= 250 cft
Bricks   = 5000. Nos.
Bitumen = 20 Kg.


UP TO FIRST STORY
Cement = 110 Bags
Fine sand =200cft
Coarse Sand = 300 cft
Brick ballast =80 cft
Bricks =7200  Nos.
Marble stone =350 sft
Glaze tiles  = 230 sft
Garenite stone= 8 sft
Frames for door and windows=140 rft
Door shutters= 4 Nos.
Wiundows shutters =12 Nos.
Wiregauze door shutters =2 Nos.
Mild steel bars = 5.2 qtl.
AC  band 100 mm diameter = 6 Nos.
AC PIPES 100 MM  diameter= 10 meter
A C pipe 75 mm diameter = 5 meter
Bizari = 160 cft
G I Pipe = 20 Meter
AC pipe 150 mm diameter =10 Meter


SECOND STORY
Cement  = 110 bags
Fine Sand = 200 cft
Coarse Sand = 280 cft.
Brick ballast = 35  cft.
Bricks = 7000. Nos.
Bizari = 160 cft.
Marble stone =320 sft.
Glaze tiles = 180 sft.
Door & window frames = 140 rft.
Doors shutters = 4 Nos.
Window shutters = 20 Nos.
Door shutters wiregauze = 2 Nos.
Mild steel Bars = 4.84  Qtl.
AC pipe 100 mm diameter = 8 meter
AC pipe 75 mm diameter = 5 meter
G I Pipe = 15 Meter

 

THIRD STORY
Same as in second story

 

FOURTH STORY
Cement   = 25 Bags
Fine Sand  = 100 Cft.
Coarse Sand = 100 Cft.
Bizari  = 20 Cft.
Door frames = 16 Rft.
Door shutter = I Nos.
Bricks = 3000 Nos.
Bricks Tiles = 800 Nos.

 

At the time of finishing
Ply Board = 450  sft.
Sunmica  = 140 Sft.
Grills Mild steel for windows = 4.7  Qtl.
Paint  =  60 litre
Door and window fittings
Latch locks /Mortice Locks =6 Nos
Handle  6 Inch = 38 Nos.
 T.Bat 10" = 25 Nos.
T.Bat 6" = 25 Nos.
Sliding Bolt = 13 Nos.
Handle 4 Inch = 56 Nos.
T.Bat 6"  = 112 Nos.
Door stopper  = 19 Nos.
Helical door spring = 6 Nos.
C B Handle  = 30 Nos.
Megnet  = 30 Nos.
C  B Locks = 9 Nos.
Water supply and drainage fittings
Sink  = 1 Nos.
W.B.=  3 Nos.
Shower= 3 Nos.
Concealed = 3 Nos.
Long body  = 18 Nos.
Short Body = 3 Nos.
Water closet Indian = 1 Nos.
W.C.English type = 2  Nos.
Waste Pipe -= 3 Nos.
Jet   = 2 Nos.
Paper holder  = 2 Nos.
Stop cocks  = 3 Nos.
Water Tank 500 litre = 2 Nos.

Thanks

Files attached : No files

Question clarification by Sunil Vnugopal on Thu Jun 26, 2008 1:17 PM
 Resp. Sir, Below are the points, you requested for: 1) Height of the building=3.00 meter 2) Chokhats/Frames of Doors and Windows made from teak face ply in shutters. 3) Marble stone flooring and glazed tiles in dado of bathroom and kitchen. Thanks Regards Sunil

Answered by S L Gupta on Thu Jun 26, 2008 10:17 AM
 Mr. Sunil,

I have seen the drawings supplied by you. Please send the following information so that I may be able to prepare the detail estimate:-

1.    Height of the building.
2.    Chokhats/ Frames of Doors and Windows. Whether they are wooden or iron.
3.    Type of wood used.
4.    Type of flooring

Thanks

Files attached : No files

Locked by S L Gupta on Tue Jun 24, 2008 5:53 PM

Copyright 2007- GharExpert.com All rights reserved.  

 
 |  Advertize with us  |  About us  |  Contact us  |  RSS  |  Blog  |  Terms of service  |  Style made simple  |  Decorating slide show  |  Tips  |  Give your feedback  |