SPECIFICATIONS
All
R.C.C works as per structural drawings
- Basement
finished floor level will be 3’ from the natural ground level
- 9”
Brick work in CM 1:6
- 4.5”
Brick work in CM 1:4 with 6mm rod at every 1.5’ once
- Ceiling plastering in CM 1:3 20mm thick
- Wall
plastering in CM 1:4 12mm thick
- Weathering
course in lime brick jelly concrete ratio 1:3 minimum 2” thick, jaggery,
kadukkai, watering, hammering and laying of clay tile.
- 4’0”
x 7’0” C/B in bedroom and Kitchen.
- One
loft in each Bedroom and L shaped in Kitchen.
- L.shaped
kitchen platform with granite top with stainless steel sink with out Drain
board.
- Roof
height 10’0” top of the concrete slab.
- parapet
41/2” thick and 3’ height
- pest
control
- M.H
with 9” Brickwork in CM 1:3 plastered on both sides. M.H cover with
precast concrete with L.angle frame.
II WOOD WORK
1. Main door – Teak wood panel door with
polish
Ames: 4” x 2.5” shutter 5” x1.5”
planks- 1” thick
2. Other doors and windows are with second
teak frames
3. Windows with glazed shutters or UPVC
windows with shutters.
4. Doors with molded door shutters.
5. FRP door for bathrooms.
6. 5” SS hinges for doors and 3” SS for
windows
7. Main door with 6 lever lock with
handle and safety chain
8. Other doors with lakshmi lock 2 lever
III TILES
Basic cost of tiles
Floor:
Rs. 50/ sft
Walls
: Rs. 35/ sft
Black Granite for
kitchen platform
7’ glazed tiles in toilet and bath rooms
2’ Glazed tiles in kitchen platform.
IV ELECTRICAL
- Wire
– orbit, finolex ( equalent
subjected to approved )
- anchor
roma or M.K with metal box, sub main and N.a circuit breakers
- 3
phase Main board with change over swith.
S.NO
|
Description
|
light
|
fan
|
5 ams
|
15ams
|
Bell
|
1
|
Verandah
|
2
|
-
|
-
|
-
|
1
|
2
|
Hall/ dining
|
3
|
2
|
3
|
1
|
-
|
3
|
Dining
|
3
|
1
|
2
|
1
|
-
|
4
|
Master bedroom
|
3
|
1
|
4
|
A/C
|
-
|
5
|
Other bedroom
|
3
|
1
|
1
|
-
|
-
|
6
|
Kitchen
|
3
|
2
|
2
|
1
|
-
|
7
|
Passage
|
1
|
-
|
1
|
-
|
-
|
8
|
Bath/ toilet
|
2
|
-
|
1
|
1
|
-
|
9
|
Outside ( in com.wall)
|
8
|
-
|
1
|
1
|
-
|
10
|
Telephone – hall , master bed
|
11
|
Television point – hall.
|
V PLUMBING
- All
PVC pipes concealed with cpvc open with upvc pipes
- 4”
drain line ( 6Kg underground 4 kg for vertical line)
- 2.5”
for kitchen and waste line.
- 2
wash basin (dining or bath) with angle cock.
- I.W.C
& E.W.C white parry ware
- All
fittings are ESS or jaquar basic model.
VI PAINTING
- Inner
wall with 2 coat cement base putty, primer, interior emulsion 2 coat.
- Outer
wall with 2 exterior emulsion.
- Wood-
primer, 2 coat putty, 2 coat enamel.
VII MATERIALS
1. CEMENT- Coramendal, Dalmia, Ramco,
zuari, priya, penna.
2. Steel –Fe-TMT ISI ROD.
BASIC RATE
1.
CEMENT RS.280/ PER BAG
2.
BLUE METAL
20 MM RS.31/CFT
40 MM RS.29/CFT
3.
SAND RS.34/CFT
4.
BRICKS RS.18600/3000
NOS
5.
STEEL RS.46,000/
MT
EXTRA COST
· Electrical extra
light= 525, fan= 850, 5ams= 850, 15ams= 1600, AC = 4200/ nos.
· elevation cost extra