|
|
Profile
|
More Options | |
|
Subhajit Kundu's Network (0) |
|
|
|
|
Subhajit Kundu's Groups (0) |
|
|
|
|
Subhajit Kundu's Collection |
|
No pictures...! | See All |
|
No articles...! | See All |
|
No Tip(s)...! | |
|
No style made simple...! | |
|
No picture story(s)...! | |
|
No Plan(s)...! | |
|
|
|
|
|
|
|
| |
Subhajit Kundu | Updated on 6/4/2014 |
|
|
|
Current profession: | Gender: |
|
Send an email to Subhajit Kundu |
| |
Pictures uploaded by Subhajit Kundu |
|
|
Forums contributed by Subhajit Kundu |
32501 views | 1 answers | Dear Sir,
Kindly calculate the cost of RCC Pillar with Material, Shuttering & Labour.
Details : Dimension : 10 inch/12 inch , Height : 10 ft, Grade of Concrete is M20 (Stone Chips : Sand : Cement = 3 : 2 : 1)
Cement : ACC F2R used, Cost @ 400/- per bag
Rebar : TATA TISCON 500D, 4 pc of 16 mm & 2 pc 12 mm rebar has been used in each pillar with 8 mm binder @ 6 inch gap .
Cost of rebar : 1. |
| 3364 views | 1 answers | Dear Sir,
Kindly calculate the cost of Brick Work of a wall admeasuring 100 sft (i.e. 10 ft in height & 10 ft in breadth) in two cases -
a) Thickness of wall is 10 inch b) Thickness of wall is 5 inch
NOTE : Pl calculate the cost without the Brick cost, i.e. Labour & Cement/Sand work only
Thanks & Regards,
Subhajit Kundu. | 2895 views | 1 answers | Dear Sir
Kindly calculate the cost of Wall Cement Plastering per sq ft with ACC Cement and the Ratio of Sand : Cement is 5 : 1 and the thickness of plastering is 0.75 inch
Pl calculate in case of Ground & First Floor
Thanks & Regards,
SUBHAJIT KUNDU. | 3880 views | 1 answers | Dear Sir,
I am constructing our house Roof with Lafarge Concreto Cement and TATA TISCON 500 D Rebar. Kindly calculate the cost of construction (Material+Labour+Shuttering). I am specifying the details --
Beam : 250 ft in total length of 250/350 mm in size with 6 (3 top + 3 Bottom) 16mm Rebar and 8mm binder @ 150 cc
Slab : Dual Cage structure of 8mm Rebar althrough @ 125 cc distance.
Kindl. | 3921 views | 1 answers | Dear Sir,
I am constructing our house with TATA Tiscon 5ooD Rebar and ACC F2R Cement. Kindly advise the Construction Cost (Material+Labour) for each Piller (with Foundation). I am specifying the details
Foundation : 1200 mm / 1200 mm/ 1500 mm (dimension), Cage (1200/1200 mm) made of 12mm TATA Tiscon 500D rebar @125 cc, Cement used ACC F2R Cement and Grade of Concrete M20.
Piller : 11 ft in hei. |
|
|
|
Subhajit Kundu's Videos (0) | |
|
No video(s) found..! |
|
Fresh at Subhajit Kundu's profile | See All |
24 November, 2024 |
No content(s) available..!
|
|
|
|
|
|
Contact Information | Address: | City: | Zip: | Country: | Website: |
|
|
Education and Work Experience | See All |
|
Education Info | |
No education(s) found..! |
|
Experience Info | |
No experience(s) found..! |
|
|