Construction
Guideline for Labor for Brick Work in Super Structure
In building construction, brick work is an essential part of construction work. Brick work is done with the help of bricks and mortar. There are two important parts of the brick work one is MATERIAL and other is LABOR. According to requirement and raw material availability, the brick work can be done with cement mortar, lime and surkhi mortar and with mud mortar. With easy availability of cement and sand, brick work is done with cement mortar. Brick work is done in different parts of the building as in foundation, super structure and parapet etc.
Brick work in Super Structure
Brick work above foundation or floor level is known as brick work in super structure. There are two types of brick wall in super structure, one is load bearing and other is non load bearing. The load bearing wall in super structure transfers the load of RCC beam, slabs and live load coming on it to the foundation of the wall. Doors, windows and ventilators are fixed in the brick walls according to drawing and requirement. Some time opening is left in the wall according to design without frame. The internal brick wall also helps to divide the building space into required component i.e. room etc. The outer brick walls serves the dual purpose as taking load and used for ornamental/ architect design of the building.
Laying of brick work in Super Structure
There are number of brick laying arrangements called bonds. English bond is most commonly used in brick work for all wall thickness. Brick work shall be laid with the help of bricks soaked in water and cement mortar. Lay cement mortar layer 6mm to 9mm thick on the damp-proof course or plinth beam and on the bed of mortar, lays the bricks with frog of brick on up side. Care should be taken that all loose materials, dirt, set lumps of mortar which may be laying on the surface of damp-proof course or plinth beam on which brick work to be freshly started shall be removed with wire brush and surface to be wetted. While laying the brick sees the mortar bed is in full width and even. The bricks should be set in position by gently pressing and should be in straight line with the help of thread and also in plumb. After completing one coarse of bricks all joints should be filled with mortar. Joints shall be fully filled and packed with mortar such that no hollow space is left inside the joints.
Common defects in brick work and cement mortar
- Raw materials like brick, sand, cement and water are of sub standard quality without qualifying any test.
- Bricks are not soaked in water properly.
- The joints in brick works are thicker, unfilled properly.
- Raking of mortar is not done when the mortar is green.
- Bricks bats are used in masonry work.
- Mortar is not mixed properly on platform.
- There is improper mixing of cement mortar.
- There is excessive water content in mortar
- Brick work is not in plumb, level and straight line.
- Mortar is not according to the structural requirements.
- There is high suction of brick and less water retention of mortar
- There are uneven joints in brick works
- There are voids in vertical joints
There are disturbances of brick works just after the layout
Over thick joints reducing the strength of brick work.
Precautions in brick work
- The length and width of the walls in foundation should be according to the drawings.
- The quality of bricks should be good having required strength and should not show any efflorescence (salt on face).
- The sand should not have fine grains and be free from silt etc. The sand used for brick mortar should be of required FM (Coarser) with no silt.
- The mixing of mortar should be proper with required quantity of water. It should not be dry or liquid.
- The bricks are soaked in water before use otherwise these will absorb water from the mortar and the bonding will be weak
- The water should penetrate to the core of the brick but the brick should be skin dry i.e. from outside when it’s used in actual.
- The frog or depression side of the brick should be upwards.
- Minimum number of bats is used.
- Bricks are absolutely aligned horizontally and in a straight line. This can be checked by a stretched string across the face.
- The bricks are vertically aligned which can be checked with a plumb bob.
- The courses or layers of bricks are level. This can be checked with a spirit level.
- The thickness of joints is not more than 1 cm.
- The joints should be filled with mortar fully without any gaps.
- The joints are pushed inside when cement mortar is still wet so that later plastering can be done effectively.
- Brick work should be kept wet for seven days so that the mortar may gain its full strength.
- Bricks, sand and cement used in brick work should be according to their specifications
Tools recommended for brick work
- Wooden setting out square
- Spirit level
- Water level
- Boning rod
- Plumb rule
- Laying trowel
- Brick hammer
- Lump hammer and bolster chisel.
- Double end comb hammer
- Straight edge
- Brick work gauge rod
;
Do you know good brick bonds can ensure the strength of a building? Only you need to select appropriate bond for walls of your house. This article tells you about the options of brick bonds and their patterns.
A brick arch is constructed to cover openings like doors and windows in a building. Arches transmit above loads to the side of an opening. They are mainly provided for architectural appearance. Let’s read to know about a few arches, their designs and precautions.
Doors or Windows opening in walls are skilled part of construction in home, work are or any other structure. It needs very careful and technical construction team to work on. Read more about making door or window opening here.
Before starting brick work the following items should be checked:
What is brick tile work? What are the guidelines for labor for brickwork in superstructure? Don’t worry about all these questions and read the article to find out the solution.
We all know the importance of brickwork in any construction, So the article here describes the guideline meant for labor for brick work in foundation.
Kota stone flooring is a subtle blend of grandeur and luxury giving the interior and exterior a gorgeous look.......
To get maximum ventilation and natural light in your house, make sure the building is properly oriented. Orientation of building saves energy and provides comfortable living as well. This article tells you about various factors and benefits of building orientation.
Preview some of the most impressive pictures of kitchen from GharExpert Gallery.
A solid roof on building is very important for everybody living in the house. The roof should be constructed in a way that assures you great safety. Here are given details about different types of roofing.
Frames of doors and windows are most important parts of your doors and windows. They are available in different size, height, width and shapes. Frames hold locks and hinges and support door and windows to shut and open easily. Here is what you need to know about different doors and windows frames.
Different steel bars are recommended for their relative tensile stresses.Steel bars are major components of construction.Here is what you need to know about steel bars (Sariya).
Brahmasthan is a powerful zone of the house. It should have open space for flow of energy in the house. The positive energy is very useful for living beings of the occupants of the house.
Brick work is an important part of construction work done with the help of bricks and cement mortar. It is done with different quality of bricks with different ratios of cement mortar according to the requirement.
Are you remodeling your bathroom? Bathroom shower doors make your bathroom a style icon. Read the following article that will help you select the bathroom shower door that will exactly suit your bathroom.
Living room or Drawing room should be located in east or north direction. The ideal location of a living room depends on plot facing.
Without knowing perfect mixture of cement and sand you can not achieve your goal.
Manufacturing date, grade and type play vital role in purchasing right cement and there should be no lumps in it.
First Class Bricks must be homogeneous in texture without showing appreciable sign of efflorescence.
A coupler connects the two pipes to each other. If the material and size of the pipe are not the same,it is called a 'reducing coupler'.
rcc structures demolishing work
Rcc concrete column core cutting work for dismantling,ranipet,tamilnadu,india,industrial structure,
Rcc concrete column core cutting work for dismantling,ranipet,tamilnadu,india,industrial structure,
Brick Work On DPC
Brick Work
Brick Work
Cement Concrete and Brick Work in Foundation of Wall
Brick Work in Foundation
First class brick work
FIRST CLASS BRICK WORK
SECON CLASS BRICK WORK
Brick works..
brick work and truss
Nice Brick Work
Brick Work for construction
super
exterior-cgi-design-rendering-for-architectural-super-market
Hindware Super Constellation Two Piece Closet WC
Temple on wheels structure constructed outside the temple
POP Ceilling, Pillar work at entrance, Stone work on wall Professionalism
Copyright 2007-
GharExpert.com All rights reserved.